The Project must be a new solar photovoltaic (PV), or solar plus energy storage, Renewable Portfolio Standard (RPS)-eligible, in-front-of-the-meter generating facility.
The Project must be physically located in, and connecting electrically to a circuit or substation within Pacific Gas and Electric Company’s (PG&E) service territory and located within an eligible DAC as further explained in the Protocol.
Behind-the-meter projects, non-renewable technologies, and other non-complementary technologies are not eligible.
The Project must have a target COD date no later than December 31, 2028. Earlier online dates are preferred.
The Project must have a demonstrably viable path to successful interconnection with the relevant authority (California Independent System Operator (CAISO) or PG&E).
The Project must qualify as a DAC-GT Project pursuant to D.18-06-027, D.24-05-065, Resolution E-5124, Resolution E-4999 and Resolution E-5367
While not a requirement, WestLight Energy prefers DAC-GT projects to include co- located energy storage and be sited in San Mateo County or Merced County, CA.